Source: MLS

This Mar Vista renovation was completed in just one month, ensuring the client could move in quickly. The project included:

  • Hardwood Floor Installation: Added beautiful hardwood flooring in the downstairs living and kitchen areas.

  • Kitchen Upgrades: Installed stone on the kitchen island and backsplash, and replaced the hood insert for a sleek, modern look.

  • Bathroom Refresh: Updated the bathroom with new tile installation for a fresh, clean design.

  • Interior Enhancements: Lime wash painted the entire interior for a soft, sophisticated finish.

  • Mirror Film Application: Applied mirror film to improve privacy and light control for the front door.

  • Plumbing Adjustments: Made minor plumbing updates for improved utility.

  • Pool Bridge Installation: Added a bridge over the pool to provide easy access to the pool filtration system, ensuring both convenience and functionality.

This renovation brought a fresh, polished look to the home, blending practicality with refined design.

Disclaimer: We were not the original builders of the house; our work focused solely on the renovation.

Mountain View

Mar Vista, CA

Property Type
Residential

Bedrooms
5

Bathrooms
6

Construction
Cosmetic Renovation

Timeline
1 Month

Interior Sqft
4,375

Lot Size (sqft)
6,716

Previous
Previous

Bledsoe Residence